{"id":353799,"date":"2025-07-30T12:25:50","date_gmt":"2025-07-30T16:25:50","guid":{"rendered":"https:\/\/msftnewsnow.com\/?p=353799"},"modified":"2025-07-30T12:25:50","modified_gmt":"2025-07-30T16:25:50","slug":"helion-energy-1st-fusion-plant-power-data-centers","status":"publish","type":"post","link":"https:\/\/msftnewsnow.com\/helion-energy-1st-fusion-plant-power-data-centers\/","title":{"rendered":"Helion Energy Begins Construction on World-First Fusion Plant to Power Advanced Microsoft Data Centers by 2028"},"content":{"rendered":"<div class=\"relative\">\n<div class=\"prose text-pretty dark:prose-invert inline leading-normal break-words min-w-0 [word-break:break-word]\">\n<p class=\"my-0\"><a href=\"https:\/\/www.helionenergy.com\/\" target=\"_blank\" rel=\"noopener\">Helion Energy<\/a>\u2014a startup at the convergence of <a href=\"https:\/\/msftnewsnow.com\/tag\/ai\" target=\"_blank\" rel=\"noopener\">artificial intelligence (AI)<\/a>, advanced energy, and sustainable technology\u2014announced it had begun construction of its first commercial nuclear fusion power plant. Located in Malaga, Washington, along the banks of the Columbia River, this pioneering facility aims to deliver clean, fusion-generated electricity <a href=\"https:\/\/www.helionenergy.com\/articles\/helion-secures-land-and-begins-building-site-of-worlds-first-fusion-power-plant\/\" target=\"_blank\" rel=\"noopener\">directly to Microsoft\u2019s vast data center operations by 2028<\/a>, marking a watershed moment in both tech and energy industries.<\/p>\n<h2 id=\"a-vision-years-in-the-making\" class=\"mb-2 mt-6 text-base font-[500] first:mt-0 md:text-lg dark:font-[475] [hr+&amp;]:mt-4\"><strong>A Helion Energy Vision Years in the Making<\/strong><\/h2>\n<figure id=\"attachment_353813\" aria-describedby=\"caption-attachment-353813\" style=\"width: 1270px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/e7drz69p964.exactdn.com\/wp-content\/uploads\/2025\/07\/gettyimages-2161933195-2048x2048-1.jpg?strip=all&lossy=1&quality=88&sharp=1&w=2560&ssl=1\"><img decoding=\"async\" data-attachment-id=\"353813\" data-permalink=\"https:\/\/msftnewsnow.com\/helion-energy-1st-fusion-plant-power-data-centers\/gettyimages-2161933195-2048x2048\/#main\" data-orig-file=\"https:\/\/e7drz69p964.exactdn.com\/wp-content\/uploads\/2025\/07\/gettyimages-2161933195-2048x2048-1.jpg?strip=all&lossy=1&quality=88&sharp=1&ssl=1\" data-orig-size=\"1280,450\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;Bloomberg&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;Helion Energy&#039;s facility in Everett, Washington, US, on Wednesday, July 10, 2024. Helion Energy plans to open the world&#039;s first fusion power plant by 2028 and to supply Microsoft Corp. with energy from it soon after. Photographer: Mike Kane\\\/Bloomberg via Getty Images&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;? 2024 Bloomberg Finance LP&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"helion\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;Helion Energy&#8217;s facility in Everett, Washington, US, on Wednesday, July 10, 2024. Helion Energy plans to open the world&#8217;s first fusion power plant by 2028 and to supply Microsoft Corp. with energy from it soon after. Photographer: Mike Kane\/Bloomberg via Getty Images&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/e7drz69p964.exactdn.com\/wp-content\/uploads\/2025\/07\/gettyimages-2161933195-2048x2048-1.jpg?strip=all&lossy=1&quality=88&sharp=1&ssl=1\" data-large-file=\"https:\/\/e7drz69p964.exactdn.com\/wp-content\/uploads\/2025\/07\/gettyimages-2161933195-2048x2048-1.jpg?strip=all&lossy=1&quality=88&sharp=1&ssl=1\" class=\"wp-image-353813 size-full\" src=\"https:\/\/e7drz69p964.exactdn.com\/wp-content\/uploads\/2025\/07\/gettyimages-2161933195-2048x2048-1.jpg?strip=all&lossy=1&quality=88&sharp=1&ssl=1\" alt=\"Helion Energy Begins Construction on World-First Fusion Plant to Power Advanced Microsoft Data Centers by 2028\" width=\"1280\" height=\"450\" srcset=\"https:\/\/e7drz69p964.exactdn.com\/wp-content\/uploads\/2025\/07\/gettyimages-2161933195-2048x2048-1.jpg?strip=all&amp;lossy=1&amp;quality=88&amp;sharp=1&amp;ssl=1 1280w, https:\/\/e7drz69p964.exactdn.com\/wp-content\/uploads\/2025\/07\/gettyimages-2161933195-2048x2048-1-150x53.jpg?strip=all&amp;lossy=1&amp;quality=88&amp;sharp=1&amp;ssl=1 150w, https:\/\/e7drz69p964.exactdn.com\/wp-content\/uploads\/2025\/07\/gettyimages-2161933195-2048x2048-1.jpg?strip=all&amp;lossy=1&amp;quality=88&amp;sharp=1&amp;w=256&amp;ssl=1 256w, https:\/\/e7drz69p964.exactdn.com\/wp-content\/uploads\/2025\/07\/gettyimages-2161933195-2048x2048-1.jpg?strip=all&amp;lossy=1&amp;quality=88&amp;sharp=1&amp;w=512&amp;ssl=1 512w, https:\/\/e7drz69p964.exactdn.com\/wp-content\/uploads\/2025\/07\/gettyimages-2161933195-2048x2048-1.jpg?strip=all&amp;lossy=1&amp;quality=88&amp;sharp=1&amp;w=768&amp;ssl=1 768w, https:\/\/e7drz69p964.exactdn.com\/wp-content\/uploads\/2025\/07\/gettyimages-2161933195-2048x2048-1.jpg?strip=all&amp;lossy=1&amp;quality=88&amp;sharp=1&amp;w=1024&amp;ssl=1 1024w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/a><figcaption id=\"caption-attachment-353813\" class=\"wp-caption-text\">\u00a0<\/figcaption><\/figure>\n<p class=\"my-0\">Helion Energy, supported by marquee investors including OpenAI CEO Sam Altman and SoftBank, <a href=\"https:\/\/www.reuters.com\/business\/energy\/helion-energy-starts-construction-nuclear-fusion-plant-power-microsoft-data-2025-07-30\/\" target=\"_blank\" rel=\"noopener\">has spent years pushing the boundaries of fusion research<\/a>. Unlike traditional nuclear fission, fusion works by smashing light atoms together, releasing tremendous energy without emitting greenhouse gases or generating significant long-term radioactive waste\u2014a key differentiator for sustainability and public acceptance.<\/p>\n<p class=\"my-0\">The Malaga site, chosen for its proximity to Washington state\u2019s robust grid infrastructure and the Rock Island Dam, represents Helion\u2019s first attempt to scale fusion from lab prototype to a power source for real-world customers.<\/p>\n<h2 class=\"mb-xs mt-5 text-base font-[500] first:mt-0 dark:font-[475]\"><strong>Microsoft\u2019s Commitment to Carbon-Free Power<\/strong><\/h2>\n<p><a href=\"https:\/\/www.helionenergy.com\/wordpress\/uploads\/2025\/07\/dsc01044-1400x788.jpg\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" data-attachment-id=\"353814\" data-permalink=\"https:\/\/msftnewsnow.com\/helion-energy-1st-fusion-plant-power-data-centers\/dsc01044-1400x788\/#main\" data-orig-file=\"https:\/\/e7drz69p964.exactdn.com\/wp-content\/uploads\/2025\/07\/dsc01044-1400x788-1-scaled.jpg?strip=all&lossy=1&quality=88&sharp=1&ssl=1\" data-orig-size=\"1280,720\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"dsc01044-1400&#215;788\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/e7drz69p964.exactdn.com\/wp-content\/uploads\/2025\/07\/dsc01044-1400x788-1-scaled.jpg?strip=all&lossy=1&quality=88&sharp=1&ssl=1\" data-large-file=\"https:\/\/e7drz69p964.exactdn.com\/wp-content\/uploads\/2025\/07\/dsc01044-1400x788-1-scaled.jpg?strip=all&lossy=1&quality=88&sharp=1&ssl=1\" class=\"alignnone size-full wp-image-353814\" src=\"https:\/\/e7drz69p964.exactdn.com\/wp-content\/uploads\/2025\/07\/dsc01044-1400x788-1-scaled.jpg?strip=all&lossy=1&quality=88&sharp=1&ssl=1\" alt=\"\" width=\"1280\" height=\"720\" srcset=\"https:\/\/e7drz69p964.exactdn.com\/wp-content\/uploads\/2025\/07\/dsc01044-1400x788-1-scaled.jpg?strip=all&amp;lossy=1&amp;quality=88&amp;sharp=1&amp;ssl=1 1280w, https:\/\/e7drz69p964.exactdn.com\/wp-content\/uploads\/2025\/07\/dsc01044-1400x788-1-150x84.jpg?strip=all&amp;lossy=1&amp;quality=88&amp;sharp=1&amp;ssl=1 150w, https:\/\/e7drz69p964.exactdn.com\/wp-content\/uploads\/2025\/07\/dsc01044-1400x788-1-scaled.jpg?strip=all&amp;lossy=1&amp;quality=88&amp;sharp=1&amp;w=256&amp;ssl=1 256w, https:\/\/e7drz69p964.exactdn.com\/wp-content\/uploads\/2025\/07\/dsc01044-1400x788-1-scaled.jpg?strip=all&amp;lossy=1&amp;quality=88&amp;sharp=1&amp;w=512&amp;ssl=1 512w, https:\/\/e7drz69p964.exactdn.com\/wp-content\/uploads\/2025\/07\/dsc01044-1400x788-1-scaled.jpg?strip=all&amp;lossy=1&amp;quality=88&amp;sharp=1&amp;w=768&amp;ssl=1 768w, https:\/\/e7drz69p964.exactdn.com\/wp-content\/uploads\/2025\/07\/dsc01044-1400x788-1-scaled.jpg?strip=all&amp;lossy=1&amp;quality=88&amp;sharp=1&amp;w=1024&amp;ssl=1 1024w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/a><\/p>\n<p class=\"my-0\">Microsoft has long been a vocal advocate for decarbonizing the global energy grid, consistently investing in a mix of renewables and nuclear power to reduce the carbon footprint of its sprawling Azure and data center footprints. Melanie Nakagawa, Microsoft\u2019s chief sustainability officer, emphasized the significance of the partnership:<\/p>\n<blockquote>\n<p class=\"my-0\">\u201cOver the last three, four years, you&#8217;ve been seeing from across the fusion space different types of milestones being met by other companies and peers, Helion included&#8230; There&#8217;s a lot of optimism that this could be the moment that fusion actually comes forward within this decade, or near in this decade.\u201d<\/p>\n<\/blockquote>\n<p class=\"my-0\">Microsoft\u2019s 2023 strategic deal with Helion secured a future pipeline of zero-carbon electricity, making it the first company to agree to buy commercial fusion energy.<\/p>\n<h2 id=\"fusions-technical-promise-and-challenges\" class=\"mb-2 mt-6 text-base font-[500] first:mt-0 md:text-lg dark:font-[475] [hr+&amp;]:mt-4\"><strong>Fusion\u2019s Technical Promise and Challenges<\/strong><\/h2>\n<p class=\"my-0\">Fusion is often cited as the \u201choly grail\u201d of energy: it promises to generate virtually limitless power, with minimal environmental impact and zero carbon emissions. However, achieving \u201cnet energy gain\u201d\u2014creating more energy than the process consumes\u2014remains one of science\u2019s great challenges, even as billions in global investment have rapidly advanced the field\u2019s progress.<\/p>\n<p class=\"my-0\">Helion\u2019s current operational prototype, Polaris (based in Everett, Washington), will serve as the model for the Malaga site\u2019s new reactor, Orion. The company intends to use this new reactor to make the leap from research to reliable, grid-scale electricity production within the next three years. \u201cWe&#8217;ll actually be able to connect to the exact same grid just upstream of the Microsoft data centers,\u201d explained Dr. David Kirtley, Helion\u2019s co-founder and CEO, to Reuters.<\/p>\n<h2 class=\"mb-xs mt-5 text-base font-[500] first:mt-0 dark:font-[475]\"><strong>The Road to Commercial Fusion<\/strong><\/h2>\n<p class=\"my-0\">Before <a href=\"https:\/\/www.helionenergy.com\/articles\/how-washington-is-leading-the-way-in-fusion-deployment\/\" target=\"_blank\" rel=\"noopener\">Helion can power Microsoft data centers<\/a>, it still faces significant regulatory hurdles. While initial construction is underway, the company must secure final state permits before it can operate the plant. Key milestones on the path include integrating with Washington\u2019s primary power delivery network and further demonstrating the stability and safety of sustained fusion reactions.<\/p>\n<p class=\"my-0\">Despite the remaining scientific and regulatory challenges, optimism abounds. In recent years, various fusion projects globally\u2014including Helion\u2014have reported milestone achievements, giving both the energy and tech industries hope that commercial fusion could become a reality within the decade.<\/p>\n<h2 id=\"what-this-means-for-microsoft-ai-and-cloud-computi\" class=\"mb-2 mt-6 text-base font-[500] first:mt-0 md:text-lg dark:font-[475] [hr+&amp;]:mt-4\"><strong>What This Means for Microsoft, AI, and Cloud Computing<\/strong><\/h2>\n<p class=\"my-0\">The implications for cloud computing, AI, and big data are profound. Microsoft\u2019s data centers\u2014serving millions of global Azure, Office, Xbox, and Copilot users\u2014require enormous, reliable power. As AI workloads grow in size and sophistication, so does their energy demand. This is especially relevant as Microsoft and OpenAI are currently in advanced talks to extend and deepen their partnership for the next wave of artificial general intelligence (AGI). The synergy is clear: clean, abundant fusion power could become the backbone not only for sustainable tech infrastructure but also for the next era of AI innovation.<\/p>\n<h2 id=\"the-strategic-importance-of-the-microsoft-helion-d\" class=\"mb-2 mt-6 text-base font-[500] first:mt-0 md:text-lg dark:font-[475] [hr+&amp;]:mt-4\"><strong>The Strategic Importance of the Microsoft-Helion Deal<\/strong><\/h2>\n<p class=\"my-0\">Helion\u2019s connection to OpenAI through Sam Altman\u2014and the possibility of powering the very data centers enabling next-generation AI\u2014highlights how tight the weave between energy and software has become. Microsoft, by securing early access to fusion power, positions itself at the nexus of sustainability, competitive infrastructure, and strategic leadership for an AI-driven future.<\/p>\n<h2 id=\"looking-ahead\" class=\"mb-2 mt-6 text-base font-[500] first:mt-0 md:text-lg dark:font-[475] [hr+&amp;]:mt-4\"><strong>What&#8217;s Next?<\/strong><\/h2>\n<p class=\"my-0\">As of today, the Malaga construction site is bustling with activity, foundational to the hope that by 2028, Microsoft data centers in Washington may flip the switch on the world\u2019s first commercial fusion-powered cloud. This project, still in its early stages, will be closely watched by the entire technology and clean energy community as an indicator of whether fusion is finally ready to scale up and deliver on decades of promise.<\/p>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Helion Energy\u2014a startup at the convergence of artificial intelligence (AI), advanced energy, and sustainable technology\u2014announced it had begun construction of its first commercial nuclear fusion power plant. Located in Malaga, Washington, along the banks of the Columbia River, this pioneering facility aims to deliver clean, fusion-generated electricity directly to Microsoft\u2019s vast data center operations by &#8230; <a title=\"Helion Energy Begins Construction on World-First Fusion Plant to Power Advanced Microsoft Data Centers by 2028\" class=\"read-more\" href=\"https:\/\/msftnewsnow.com\/helion-energy-1st-fusion-plant-power-data-centers\/\" aria-label=\"Read more about Helion Energy Begins Construction on World-First Fusion Plant to Power Advanced Microsoft Data Centers by 2028\">Read more<\/a><\/p>\n","protected":false},"author":208461344,"featured_media":353814,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"enabled":false},"version":2}},"categories":[24,2539],"tags":[40,829,1347,778,1032,1216],"class_list":["post-353799","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-business-and-enterprise","tag-azure","tag-copilot","tag-data-center","tag-microsoft","tag-openai","tag-xbox"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/msftnewsnow.com\/wp-content\/uploads\/2025\/07\/dsc01044-1400x788-1-scaled.jpg","jetpack_shortlink":"https:\/\/wp.me\/pfgCZY-1u2r","jetpack-related-posts":[{"id":22416,"url":"https:\/\/msftnewsnow.com\/microsoft-to-purchase-power-from-three-mile-island\/","url_meta":{"origin":353799,"position":0},"title":"Microsoft to purchase power from the Three Mile Island nuclear plant in Pennsylvania in 20-year agreement with Constellation Energy","author":"Dave W. Shanahan","date":"September 20, 2024","format":false,"excerpt":"Microsoft has signed a 20-year agreement with Constellation Energy to purchase power from the Three Mile Island nuclear plant in Pennsylvania. The plant, which has been offline for five years, is expected to restart by 2028, pending approval from the Nuclear Regulatory Commission. This deal will provide Microsoft with a\u2026","rel":"","context":"In &quot;News&quot;","block_context":{"text":"News","link":"https:\/\/msftnewsnow.com\/news\/"},"img":{"alt_text":"Microsoft to purchase power from the Three Mile Island nuclear plant in Pennsylvania in 20-year agreement with Constellation Energy","src":"https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2024\/09\/WTYCUOHQE5O77BPWW7KXQSTD2Y.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2024\/09\/WTYCUOHQE5O77BPWW7KXQSTD2Y.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2024\/09\/WTYCUOHQE5O77BPWW7KXQSTD2Y.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2024\/09\/WTYCUOHQE5O77BPWW7KXQSTD2Y.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":350938,"url":"https:\/\/msftnewsnow.com\/microsoft-idaho-national-lab-ai-nuclear-power\/","url_meta":{"origin":353799,"position":1},"title":"Microsoft and Idaho National Lab (INL) Leverage AI to Transform Nuclear Power Permitting in the U.S.","author":"Dave W. Shanahan","date":"July 16, 2025","format":false,"excerpt":"Microsoft has announced a strategic partnership with the Idaho National Laboratory (INL) to leverage artificial intelligence in the nuclear power permitting process. This development, announced July 16, 2025 by Reuters, aims to streamline and accelerate the traditionally slow and complex regulatory journey necessary for building and operating new nuclear power\u2026","rel":"","context":"In &quot;News&quot;","block_context":{"text":"News","link":"https:\/\/msftnewsnow.com\/news\/"},"img":{"alt_text":"Microsoft and Idaho National Lab (INL) Leverage AI to Transform Nuclear Power Permitting in the U.S.","src":"https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2025\/07\/25-50524_MS-INL-Social_2000x800_R2-3-1536x614-1-scaled.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2025\/07\/25-50524_MS-INL-Social_2000x800_R2-3-1536x614-1-scaled.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2025\/07\/25-50524_MS-INL-Social_2000x800_R2-3-1536x614-1-scaled.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2025\/07\/25-50524_MS-INL-Social_2000x800_R2-3-1536x614-1-scaled.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2025\/07\/25-50524_MS-INL-Social_2000x800_R2-3-1536x614-1-scaled.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":345348,"url":"https:\/\/msftnewsnow.com\/microsoft-opens-indonesia-central-cloud-region\/","url_meta":{"origin":353799,"position":2},"title":"Microsoft Opens First Cloud Region in Indonesia for 2025, Dubbed &#8220;Indonesia Central,&#8221; Ushering in a New Era for AI and Digital Innovation","author":"Dave W. Shanahan","date":"May 27, 2025","format":false,"excerpt":"Microsoft officially opened its first cloud region in Indonesia, named \"Indonesia Central,\" marking a major milestone in the nation\u2019s digital transformation journey and Microsoft\u2019s strategic expansion in Southeast Asia. This AI-ready hyperscale cloud infrastructure brings in-country data residency, robust security, and low-latency cloud services to Indonesian businesses, government entities, and\u2026","rel":"","context":"In &quot;AI and Copilot&quot;","block_context":{"text":"AI and Copilot","link":"https:\/\/msftnewsnow.com\/ai-and-copilot\/"},"img":{"alt_text":"Microsoft Opens First Cloud Region in Indonesia, Dubbed \"Indonesia Central,\" Ushering in a New Era for AI and Digital Innovation","src":"https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2025\/05\/DSC_2924-scaled-1.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2025\/05\/DSC_2924-scaled-1.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2025\/05\/DSC_2924-scaled-1.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2025\/05\/DSC_2924-scaled-1.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2025\/05\/DSC_2924-scaled-1.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":4147,"url":"https:\/\/msftnewsnow.com\/nuclear-power-for-data-centers\/","url_meta":{"origin":353799,"position":3},"title":"Breakthrough nuclear power for data centers: Microsoft and TerraPower harness enhanced AI in Operations","author":"Dave W. Shanahan","date":"December 12, 2023","format":false,"excerpt":"Microsoft is exploring the possibility of using nuclear power for data centers, which are the backbone of its cloud computing and AI services. The company has signed a memorandum of understanding with TerraPower and PacifiCorp, an electric utility company, to evaluate the feasibility and benefits of deploying a new type\u2026","rel":"","context":"In &quot;News&quot;","block_context":{"text":"News","link":"https:\/\/msftnewsnow.com\/news\/"},"img":{"alt_text":"nuclear power for data centers","src":"https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2023\/12\/350c955e-de0a-4810-b73f-e3bb271cbb42.jpeg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2023\/12\/350c955e-de0a-4810-b73f-e3bb271cbb42.jpeg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2023\/12\/350c955e-de0a-4810-b73f-e3bb271cbb42.jpeg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2023\/12\/350c955e-de0a-4810-b73f-e3bb271cbb42.jpeg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":17389,"url":"https:\/\/msftnewsnow.com\/microsoft-major-data-center-in-granger-indiana\/","url_meta":{"origin":353799,"position":4},"title":"Microsoft to build massive data center in Granger, Indiana, to help boost local economy","author":"Dave W. Shanahan","date":"June 4, 2024","format":false,"excerpt":"Microsoft has announced plans to construct a massive new data center in Granger, a town located in St. Joseph County, Indiana. The tech giant has acquired a significant amount of land for this ambitious project, further expanding its data center footprint in the state.","rel":"","context":"In &quot;News&quot;","block_context":{"text":"News","link":"https:\/\/msftnewsnow.com\/news\/"},"img":{"alt_text":"data center in granger","src":"https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2024\/06\/3bbd8da7-3f86-407e-8095-273303be3a6f.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2024\/06\/3bbd8da7-3f86-407e-8095-273303be3a6f.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2024\/06\/3bbd8da7-3f86-407e-8095-273303be3a6f.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2024\/06\/3bbd8da7-3f86-407e-8095-273303be3a6f.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":348039,"url":"https:\/\/msftnewsnow.com\/microsofts-chile-central-sovereign-data-center\/","url_meta":{"origin":353799,"position":5},"title":"Microsoft Launches &#8220;Chile Central,&#8221; Amazing Opportunity As First Sovereign Data Center Region Opens in Chile","author":"Dave W. Shanahan","date":"June 20, 2025","format":false,"excerpt":"Microsoft has officially launched its first sovereign data center region in Chile, named \"Chile Central.\" This new region, strategically located in the Santiago metropolitan area, comprises three physically independent sites housing multiple state-of-the-art data centers. The launch marks a pivotal step in Microsoft\u2019s ongoing commitment to accelerating digital transformation, enhancing\u2026","rel":"","context":"In &quot;Business &amp; Enterprise&quot;","block_context":{"text":"Business &amp; Enterprise","link":"https:\/\/msftnewsnow.com\/business-and-enterprise\/"},"img":{"alt_text":"Microsoft Launches \"Chile Central,\" Amazing Opportunity As First Sovereign Data Center Region Opens in Chile","src":"https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2025\/06\/Anuncio-Chile-Central-Microsoft-960x640-1.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2025\/06\/Anuncio-Chile-Central-Microsoft-960x640-1.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2025\/06\/Anuncio-Chile-Central-Microsoft-960x640-1.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/msftnewsnow.com\/wp-content\/uploads\/2025\/06\/Anuncio-Chile-Central-Microsoft-960x640-1.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]}],"jetpack_likes_enabled":true,"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/msftnewsnow.com\/wp-json\/wp\/v2\/posts\/353799","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/msftnewsnow.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/msftnewsnow.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/msftnewsnow.com\/wp-json\/wp\/v2\/users\/208461344"}],"replies":[{"embeddable":true,"href":"https:\/\/msftnewsnow.com\/wp-json\/wp\/v2\/comments?post=353799"}],"version-history":[{"count":0,"href":"https:\/\/msftnewsnow.com\/wp-json\/wp\/v2\/posts\/353799\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/msftnewsnow.com\/wp-json\/wp\/v2\/media\/353814"}],"wp:attachment":[{"href":"https:\/\/msftnewsnow.com\/wp-json\/wp\/v2\/media?parent=353799"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/msftnewsnow.com\/wp-json\/wp\/v2\/categories?post=353799"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/msftnewsnow.com\/wp-json\/wp\/v2\/tags?post=353799"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}